Scaffolding Steel Tube
Product Name: Galvanized Scaffolding Steel Pipe OD:48.3mm,48.6mm Material:Q195,Q235,Q345,a53, st37, st52, s235jr, ss400 Wall thickness: 2.0mm~4.0mm Pipe Ends:Plain End Length: 5.8mtr, 6.0mtr Standard: ASTM A53, BS1387, BS1139, EN10255, EN39, JIS3444, GB/T 3091 & GB/T13793.
Email: ruijiesteel@rui-jie.com
Certification:
Galvanized Steel Pipe
Contact:
Scaffolding Steel Tube

- Our galvanized scaffolding steel pipe is specifically designed for modular scaffolding systems, offering excellent durability and reliable load-bearing performance for construction projects. Manufactured under BS 1387 with an outer diameter of 48.3mm, or JIS G3444 with 48.6mm OD, the pipe is available in wall thicknesses from 2mm to 4mm and standard lengths of 5.8m or 6m. The surface is hot-dipped galvanized with a uniform zinc coating, providing strong corrosion resistance for long-term outdoor use. This scaffolding pipe is fully compatible with scaffolding couplers, clamps, and base plates, making it ideal for building frames, bridge works, and industrial maintenance. Strict quality control ensures consistent dimensions and straightness, while threaded or plain ends are available according to project requirements. Whether for rental fleets or one-time construction use, our galvanized scaffolding tube delivers safety, strength, and cost-effectiveness on every job site.
Product Image:
All images shown are actual product shots taken in our factory. No rendering, no stock photos. The galvanized scaffolding pipes you see are exactly what we deliver – same material, same surface, same end finish. Every detail, from the zinc coating to the threaded ends, reflects our real production quality. Trust what you see.

Gi Steel Pipe In Stock

High Zinc Coating

Plain End

Pipe Cap Protection
Galvanized Steel Pipe Specifications:
| JIS G3444 STANDARD | |||
| OD(mm) | WALL THICKNESS(mm) | LENGTH(mm) | Theoretical Weight(kg) |
| 48.6 | 2.1 | 2-6m | 14.45 |
| 2.2 | 15.1 | ||
| 2.3 | 15.76 | ||
| 2.4 | 16.41 | ||
| 2.5 | 17.05 | ||
| 2.6 | 17.7 | ||
| 2.7 | 18.34 | ||
| BS1387 STANDARD | |||
| OD(mm) | WALL THICKNESS(mm) | LENGTH(mm) | Theoretical Weight(kg) |
| 48.3 | 2.75 | 2-6m | 18.53 |
| 3.00 | 20.11 | ||
| 3.20 | 21.35 | ||
| 3.60 | 23.81 | ||
| 3.75 | 24.72 | ||
| 3.80 | 25.02 | ||
| 4.00 | 26.22 | ||
During the production of galvanized steel round tube, the following steps require special attention.
1.Weld seam treatment
Polish, repair, and inspect the welds of steel pipes to remove defects and avoid leakage issues during subsequent use.
2.Galvanized treatment.
Immerse the steel pipe in molten zinc solution to attach a layer of zinc on the surface of the steel pipe, in order to improve its corrosion resistance.
3.Inspection and packaging
Conduct various quality inspections on finished steel pipes, including size, appearance, weld quality, zinc layer thickness, etc.

| Grade | Q195 = S195 / A53 Grade A Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2 Q355 = S355JR / A500 Grade B Grade C |
| British Standards | BS1387, BS1139 |
| European Standards | EN10255, EN39 |
| American Standard | ASTM A53, API 5L, ASTM A252, ASTM A795 |
To maintain the integrity of the galvanized coating during packaging and transit, careful handling is essential. The pipe surface must be shielded from sharp edges and heavy impact to avoid scratches, dents, or coating peeling. Proper protective measures not only preserve the product appearance but also ensure its long-term anti-corrosion performance.

Machine Bundling

Galvanized Strapping

End Protection

Container Loading
Our galvanized scaffolding steel pipe is widely used in construction, maintenance, and industrial projects. It serves as the core component for supporting structures, providing safe and stable working platforms at various heights. Commonly applied in building frame construction, bridge piers, tunnel supports, shipyard repairs, and temporary event stages, this pipe is also ideal for facade renovation, power plant maintenance, and warehouse racking systems. When paired with standard couplers, jacks, and base plates, it forms a flexible and robust scaffolding system suitable for both indoor and outdoor use. Its standardized dimensions ensure quick assembly and disassembly, improving work efficiency while meeting strict safety requirements on every job site.

previous page
next page
previous page
none
next page
Related Products